                      There are various kind of materials used for construction purpose.    1. The local malba is one of them, it can be used as fillers. It is nothing but the construction waste or waste from demolished building. The cost of this malba is approx. 600 rs (date:8/11/2021) per trolly. 1 trolley consist of 100 cubic feet of material. Use of these material not only reduce cost but it is also good for environment.    2. Bricks :- The different types of bricks mostly are used  red bricks ,fly ash bricks and AAC blocks etc. Red bricks are made of burnt clay or mixture of sand and lime. They are commonly used since these are economical and easily available everywhere.This bricks are good in strength and its cost is approx.      Rs. 7500 for 1500 bricks. Fly Ash bricks are made of fly ash, lime, gypsum and sand.  These are als...
Recent posts
                                                          TIN SHED CONSTRUCTION Material Used 1. Corrugated sheet. (30 mm, 8 feet)  2. M.S Box section (size:-1.5"X1.5") 3. Angle 4. Profile screw                                                                                                                                    Image consist of profile screw,box section and tin...
                                FOREST MODEL FOR SHERNI MOVIE 20201 ·          It is hypothetical model for a scene in sherni movie 2021, for the film production company, Abundantia Entertainment Pvt Ltd. The movie is based on man animal conflict & wildlife conservation. ·          The size of model is 8’ X 6’ (Rectangular), showing forest & village area. Size is large so that people can stand around it for discussion. As the scene is forest department officers & MLA are discussing the conflict between villagers & tigress.   ·          It consists of a mine, mountain & valleys, lakes & rivers, agricultural land & roads & bridges. It shows, how these different zones are located in that particular village. So that audience can get the idea of existing s...
                                      3D VIEW OF EXISTING BUILDING      The existing building consist of ground floor which includes residential  and commercial space. The existing ground floor structure has two separate 1bhk at back side & with entrance passage in between shop and ATM in front. This 3D-veiw is designed keeping existing structures in mind. First floor is newly designed which includes 2bhk residence for owner with terrace and one room is designed for office space. As the building faces highway minimum projections are made. Due to high tension wires in front area most of the space is kept enclosed only small balcony is given.      
                                     PLANTS FOR WASTE WATER TREATMENT :- CANNA   LILIES Water is most the important source in our day to day life, it covers about 71% of the earth surface.97%of the earth water is found in the ocean (too salty for drinking, growing crops, and most industrial uses except cooling).3% of the earth’s water is fresh. So its water important to save water and reuse it again. The grey   water that is release from wash basin, bath water & washing machine run off water can be filtered using these canna lilies plant.Canna lilies remove toxic heavy metals, nitrogen ,phosphorous & radioactive nucloids among pollutants.                           ...

Drawings required,before starting construction because of drawing your construction work goes smoothly & fast on site.

. Preplanning is must. 1. Floor plan a.  Designed by architect according to client's requirement. b.  Freeze the plan. 2. Elevation & 3D:- After finalization , they will 3. Electrical Drawing 4. Drainage & watersupply 5. Interior :- It is must with the theme,  client want. It will become costly if that work is done  later.  For example if you want hanging light,  you need to leave that point on RCC Slab/or falsecelling or for inhance of a wall light might need to scratched out for hiding electrical cable inside. 6. Landscape :- Orramental plants & plants for vegetable garden. Their location & selection according to clients. 3.a Placing lights & fan according to furniture layout. b.  Providing light for exterior facade etc.   c. Provision of solar light & capacity of it. 4. a. Planning drainage according to existing sewer or without it b. Providing inspection chamber & traps accordingly. c.  Calculating water requir...

6 Must do during architectural thesis.

   1. Preplan everything like how many sheets will be made & time required.  Try to finish work within that timeframe only. 2. Leave at least 3 day before submission to work on sheet,that is least Worked on. 3.  Take help of seniors & juniors. Like for model making,  taking photographs of them.  For printout at shops. 4. Complete 2D drawing first then go for concept sheet & at last 3D,because lapi many times get hung due to heavy file.  Rendering of 3D takes long time.  One can use lapi of junior/senior for rendering 3D as well. 5. At last do the format of sheet i.e. little of thesis your name etc. 6. Generally finalization of sheet is done on photoshop.  So size of sheet (mb) depends on size of paper A4/AO/Roll. Don't save image as high-quality as this type of file take lot of time for printing. Use optimum quality. 7. Take printouts 1 day before submission. Ask the shopowner of printers for time required & your turn. One sho...